AKIN GOGUS, P.E.
Mechanical Engineer, M.Sc.
220 West End Avenue, Hopatcong, NJ 07843
Tel: (862) 432 – 3575 akingogus@gmail.com
QUALIFICATIONS:
Responsible for the design of mechanical and electrical
drawings for Data Centers, Telecom and Mission Critical Facilities;
coordination of architectural, mechanical & electrical specifications;
preparation of project plans & schedules; project management and quality
assurance during construction phase; supervision of systems during start-up
& commissioning. Extensive
experience with on-site analysis for future growth of companies, preparation of
consulting reports, project management, and design of critical infrastructure
systems.
US
Citizen
CERTIFICATION:
Jan
2010 NJ State Board of
Professional Engineers & Land Surveyors; Licensed Professional Engineer
(24GE04836300)
Jul 2010 NY
State Education Department, Office of Professions; Licensed Professional
Engineer (088411)
HIGHLIGHTS:
2010 Spread Networks, New data
center construction project, Carteret, NJ. The project total was $2.14M to be
completed in 21 weeks. Completed on time with profit.
2009 Panalpina
Inc., Data Center Critical Infrastructure Upgrade Project, Morristown, NJ. The
project total was $250k to be completed in 6 weeks. Completed
on time with profit.
2009 Coherent Inc. Cleanroom
expansion & upgrade project, East Hanover, NJ. The project total was $500k
to be completed in 10 weeks. Completed on time with profit
2008 Bed Bath & Beyond Union Data Center Phase-2 Expansion project, Union,
NJ. The project total was $500M to be completed in 10 weeks. Completed in 8½
weeks with profit and received award payment for early completion.
2003 NTTA-America data center
expansion project, New York, NY. The project total was $378k to be completed in
8 weeks. Construction completed in 7 weeks with profit.
1998 Prekons, Prefabricated
building panels surface preparation and painting line automation upgrade
project, Ankara, Turkey. The budget was $900k to be completed in 12 months.
Project completed in 7 months and under budget as $780k.
1996 Gama
Factory, Replacing old vertical machining center in factory with new CNC &
higher capacity one, Ankara, Turkey. The budget was $1.8M to be completed in 2
years. Project completed in 19 months and under budget as $1.6M.
EXPERIENCE:
May 00– Pres: Sullivan Associates, Cedar Knolls, NJ
Senior
Mechanical Engineer
Responsible for HVAC, ductwork, chilled water, water supply,
condensate drainage and natural gas piping system drawings (by AutoCAD) and
calculations. Preparation of preliminary electrical
one-line diagrams, recommendation for best equipment layouts and architectural
site plans. Selection of the optimal critical
infrastructure equipment for Data Centers, Telecom Facilities & Computer
Rooms.
·
Duties include development of contract documents
and scope of work on mechanical - electrical systems, project time plans and
project budget price estimates. Negotiations with suppliers and contractors.
·
Experience in installation and operation of
CRAC’s, chillers, pumps, UPS’s, generators, electrical infrastructures and fire
detection – suppression systems for Mission Critical, Telecom and Data Center
facilities. Supervision and coordination of subcontractors on site working in
operational data centers.
·
Expert of consultancy reports involving new
proposed construction projects as well as improving existing infrastructure.
Energy consumption and pay back analysis on mechanical and electrical systems.
·
Supervising service and preventive maintenance
of existing infrastructure equipment.
·
Supervising several subcontractors during
projects.
·
List of projects completed available upon
request.
Oct. 98- Jul. 99 PREKONS Construction Industry Inc.
/Factory, Ankara - Turkey
Factory
Manufacturing Manager
·
Re-planned factory layout according to
manufacturing lines. Built new production line for prefabricated buildings
section. In charge of selecting tools, equipment and procedures best suited for
manufacturing stages. Conducted market research and cost comparison for
specific tools, equipment and investments in the factory. Studied and analyzed state-of-the-art
materials and implemented in product development for Prefabricated
Construction.
·
Sample Projects: Baku, Airport Control Tower
Steel Structure; Supsa, Pipeline Control Building;
Baku, Pepsi Factory & Storage Buildings Steel Structure.
·
Supervised 2 engineers and 65 workers.
Oct. 9 -Aug. 98 GURIS
Construction & Engineering Co., Inc. / Factory, Ankara - Turkey
Factory
Manufacturing Chief
·
Served as decision maker in choosing tools,
equipment and procedures for manufacturing & machining stages. Organized
and planned for maintenance and repair of the factory equipment; was in charge
of the standard controls and repairs. Conducted market research (international
and domestic) and cost comparisons for specific tools, equipment, investments
and spare parts to be purchased for manufacturing processes. Fully responsible to ensure occupational
safety rules and laws were observed. Prepared price quotes for manufacturing
& machining processes for the future projects of the factory.
·
Sample Projects: Cayirhan,
Thermal Power Plant Steel Structure & Equipment, Yatagan
Desulphurization Units’ Process Towers.
·
Supervised 2 engineers, 14 workers and 4
subcontractors.
Dec. 92-May 97 GAMA Industrial
Plants Manufacturing & Erection Co./Factory,
Ankara - Turkey
Manufacturing
Chief
·
Planned and organized factory workflow on
manufacturing of heavy steel structures, pressure vessels, boilers and
mechanical equipment mainly related to cement factory projects. Organized
workshop for specific manufacturing items (such as manufacturing of Heat
Recovery Steam Generators and machining of Spiders of Hydroelectric Power Plant
Generators). Duties included selecting,
purchasing, manufacturing and implementation of equipment and tools for
machining, cutting, erection sections of the factory workshop. Conducted market
research (international and domestic) and cost comparisons for tools,
equipment, investments and spare parts to be purchased for manufacturing
processes. Prepared cost analysis and
time schedules for the machining operations.
Served as a member of the manufacturing department’s ISO 9000
certification team for the factory. The
work involved application of required procedures and preparation of the
documents.
·
Sample Projects: Izmit,
EnerjiSA Heat Recovery Steam Generator; Izmit, Yuvacik Dam &
Pipeline; Izmit, Nuh Cement
Factory 2.Klinker Production Line; Izmit, Nuh Cement Factory White Brick Production Factory; Birecik, Hydroelectric Power Plant Equipment &
Pipelines.
·
Supervised 3 engineers and 90 workers.
Apr. 89-Dec. 91 FORM
A.S./Factory, Ankara - Turkey
Factory
Technical Manager
·
In charge of manufacturing program consisting of
water-cooling towers, chilled water producing units and heat exchangers. Duties
included organizing workshop, planning of manufacturing, selecting and
purchasing raw materials for manufacturing, equipment & tools. Produced cost analysis for products.
Conducted research for and implemented new products (such as Cooling Towers
with Radial Fans and Chiller Units with Screw Compressors). Provided assistance
to factory manager in financial and administrative aspects.
·
Supervised 35 workers.
EDUCATION:
1997 Advanced
Management Certificate; Department of Management, Middle East Technical
University, Ankara, Turkey
(“Commendable” standing).
1990 M.S. Degree; Mechanical
Engineering Department, Middle East Technical University, Ankara, Turkey.
1987 B.S. Degree; Mechanical
Engineering Department, Middle East Technical University, Ankara, Turkey
COMPUTER SKILLS:
AUTOCAD 2012, WINDOWS 7,
WORD, EXCEL, MSPROJECT, POWERPOINT, VISIO, ADOBE and PHOTOSHOP